"Beauty And The Tourism Development Aysen Might Require Altering "

“I sincerely think that if it is necessary to alter the project design must be done. Maybe even have to eliminate some projects, I would not say no, if the damage they do does not outweigh the benefit they bring to the country as a whole, “said the specialist, who after laying out his vision on energy needs Chile expressed support for the use of water potential and even Aysen, will materialize or not the dams, forward-looking in the nuclear alternative. The meeting, attended by regional authorities, employers and union and environmental leaders, said that according to the information handled, utilities would not be considering the possibility of reducing the number of dams. “I understand that companies are not in that. Many times there are people who asserted that this project is to do it this way, because that earns the maximum energy … I think it may have to lose energy simply to protect the environment ” said, adding that “the best project is not necessarily the best in the country.” Sebastian Bernstein also looks at the possible changes that would be generated in the transmission lines, because “the issue of respect of the landscape and the whole development of tourism in the region, which means for all who have visited this area for its incredible beauty, imply that there necessarily must be willing to pay very high costs to avoid visual impacts. ” He noted that “all paths of line, also central to some extent, but especially the line should effectively avoid damaging the landscape. And the truth is that there are solutions, which are sometimes expensive and maybe mean a tug of war, but I think the area sites, justify solutions that can be very expensive. ” In his opinion “in some sections to better justify the line on the tracks go very far, costing much more expensive, or they go underground or underwater in sections, if that will affect the beauty and (create) visual impact in some areas. ” In this context, to review the environmental impact study now under evaluation, which includes shots of the layout for the interconnection of the five dams on the Baker and Pascua rivers and outline the size of each tower (above 70 meters and an easement strip of 65 meters) – shows that the proposed non-electric underground line to avoid the visual impact on any stage, even in the Cochrane area where his journey south skirt an important part of the Carretera Austral scenic route considered by the National Tourism Service.

The Apartment

First of all, we need to understand that we are looking for. Let us define our key criteria. Size of the apartment. Area location of the house. Are we ready to buy an apartment on the first or the last floor. We must immediately determine which binding elements of the apartments would like to see.

For example, the presence or absence of , bathroom or separate. We can set the gradation in the form of minimum kitchen area or a minimum number of rooms. Of course Also, we can introduce a number of additional criteria. Distance to major thoroughfares, easy to use public transport to get to shelter, infrastructure, etc. But from my point view, all these issues are best addressed in the future when you view a potential apartment, per se. At the initial stage to highlight the basic points which for us is absolutely critical. If the object does not match them, then we will not even spend time watching it.

Naturally, I deliberately did not mention the main point in all this is the amount of money that we are willing to spend on purchasing an apartment. Sift through the funnel of the options factor, we are able to cut a large number of objects and not waste our time wasted. Hopefully, you already can answer those questions, which I announced earlier, or better yet write their answers on paper. Take a sheet of A4 divide it into two parts. On the left write down absolutely critical moments and on the right side, those moments that you would like to see in the acquiree as an additional facility.

1 2